|
|
1 |
Before
starting, the lower strap(1) should be slackened off. The header pole
(2) should be inserted if it has not been left in the flysheet
|
2 |
Insert
the alloy tent pole into the pole sleeve at the lower end
(1) and
feed it through until it fits into the sleeve pocket at (2). The
lower end of the pole is inserted into the eyelet in the strap at
(1) and the strap tightened
|
3 |
Hiking
poles should be set to 1350 length, and the handle straps tied around
the header pole at either end (3). The hiking pole tips fit into the
stap eyelets on the bottom edge of the back panel
|
4 |
Peg out the corners at (4)
and the guylines at (5) as a minimum, the additional guylines can also be used if required.
|
* |
In strong winds, pegs should be put in at the front end (1) and at the corners (4) first, before inserting the pole into the sleeve.
|
|
top
|